14 October 2026 VIRM amendments available to preview
VIRM amendment previews are now available to download and view.
These amendments are effective from Wednesday 14 October 2026.
Please make sure you are familiar with the changes that are relevant to you (and remember to update your QMS/PRS Technical information record).
If you have any feedback on the changes, email us at specialistchannels@nzta.govt.nz by Wednesday 30 September 2026.
VIRM: In-service certification (WoF and CoF)
In this amendment includes changes:
- that fix a definition misalignment with the Land Transport Rule: Vehicle Standards Compliance 2002
- to LVV requirements regarding aftermarket motorcycle handle bars
- to the Cardan shaft park brake sticker (and how to order the new stickers).
VIRM: In-service certification (WoF and CoF) amendment preview
VIRM: Entry certification
In this amendment includes changes:
- to instructions around removing a damage flag on a heavy vehicle
- changes to emissions tables, particularly around the introduction of ADR79/05
- other small content clarifications and improvements.
VIRM: Entry certification amendment preview
VIRM: Entry certification (new light vehicles)
This amendment includes changes to emissions tables, particularly around the introduction of ADR79/05.
VIRM: Entry certification (new light vehicles) amendment preview
VIRM: Heavy vehicle specialist certification
In this amendment includes:
- updates to MRCOP drawings. There are 4 new drawings and each drawing can now be downloaded separately
- updates to minimum file content and procedure documentation sheets (PDS) and their requirements
- changes to the Cardan shaft park brake sticker (and how to order the new stickers)
- general improvements.
VIRM: Heavy vehicle specialist certification amendment preview
VIRM: Light vehicle repair certification
Updates to Technical bulletin 5: Threshold for lifting border damage flag. These changes:
- raise the threshold for when border damage flags can be removed
- clarify criteria, ensuring only repairs of meaningful structural significance require border damage flags to remain in place.